nalam.ca Learn
Sign in Join a group

Click a box to open the area, or click any item inside it to go straight to that page. The bar at the top opens Project and access.

Project and access

Settings fixed when a project is made

Tablespace, options, access and Full Audit Trail Support are chosen in the New Project wizard. Check them before the first injection, not after.

The New Project wizard asks a few questions that are easy to click through. Each answer stays with the project.

The wizard, page by page

  1. Parent. Where the project sits in the tree. Some labs use parent projects per product or per client.
  2. Tablespace. The project’s space in the database. 50 MB is the default. Waters says raise it if you expect many results.
  3. Full Audit Trail Support. With it on, Empower keeps a record of every change to methods, samples and results and asks for a change description when you save. You also choose whether comments are required for method, result, sample and deletion changes.
  4. Options. Which Empower options the project can use (for example System Suitability).
  5. Access Control. Which users and groups can open the project.
  6. Copy Selection. Start from another project’s methods. Useful, but check you copy the approved version, not whatever was last saved.
  7. Name. If full audit trail is on, you also type a comment for the creation itself.

Why “at creation” matters

Waters’ audit trail white paper says it plainly: the audit trail settings are fixed when the project is made, and a system policy only changes projects made after it. So a training project copied into GMP use keeps its training settings.

Reasons for change

Empower can ask for a reason silently (no prompt), from a pick list, or as free text. A short pick list (“integration error”, “typing error”, “wrong standard lot”) makes review faster. Free text alone tends to fill up with “ok” and “reprocess”.

What a reviewer checks

  • Full Audit Trail Support is on for every GMP project.
  • Comments are required for method and result changes.
  • Access lists only the people who need it.

The numbers

Where
Configuration Manager: Manage > Create New Project 1
Default tablespace
50 MB; increase it if you plan a large volume of results 1
Full Audit Trail Support
Optional check box; records all changes to methods, samples and other elements 1
Comments
Choose whether comments are required for changes to methods, results, samples and deletions 1
Access Control page
Which users and user groups can open the project, and at what level 1
Copy Selection page
Copy methods and other items from an existing project 1
Reasons for change
Silent, pre-defined or free text 2
Changing the policy later
System policies only affect projects made after the change 2

What goes wrong

  • Changes were saved with no reason recordedCheck: Waters: changes are traced even when comments are not required, but no reason is asked for. Check whether the project requires comments, and what your procedure says. 1
  • A GMP project was made without Full Audit Trail SupportCheck: Waters: the setting is fixed when the project is made, and a new system policy will not fix old projects. Make a new project with the right settings under change control. 2
  • The project runs out of spaceCheck: Waters: 50 MB is only a starting point. Plan the tablespace from the number of results you expect. 1

Check yourself

Tap an answer to see if you are right and why.

When is Full Audit Trail Support decided for a project?

Sources

  1. Waters, 2017, Empower 3 Getting Started Guide (715005480). Appendix A, Creating projects, pp. 118-123.
  2. Waters, 2017, Empower Software Audit Trails and Logs: a guide to the different locations of audit trails in Empower (white paper). Project and system policies, p. 2; reasons for change, p. 3.

New modules by email

I am adding the Empower pages area by area, together with the live group Empower 3 for Beginners. Leave your email and I will send you each one when it is ready.

My HPLC newsletter too, about once a week. Unsubscribe any time. Privacy