Module
Project and access
The project is the box everything sits in: methods, raw data, results and the audit trail. Some of its settings are fixed the day it is created.
Everything you do in Empower happens inside a project. Waters calls it the basic unit of the software: methods, results, peaks, custom fields and raw data, plus the audit trail and sign-offs.
Two things about the project matter more than they look.
First, the raw data and the rest are stored in different places. The methods and results live in the Empower database; the raw data files live in a separate folder. A backup has to take both.
Second, some settings are decided once, when the project is made. Full audit trail and the comments it asks for are among them. A training project and a GMP project can look the same on screen and behave very differently.
The pages below cover what to check when a project is made, who should have which rights, and backups.
The numbers
- What a project holds
- Methods, results, peaks, custom fields and raw data; may also hold audit trail and sign-off information 1
- Where it is stored
- Everything except raw data in the Empower database; raw data in a separate directory 1
- Audit trail settings
- Fixed when the project is created; system policies only change new projects 2
What goes wrong
- A GMP project was created without Full Audit Trail SupportCheck: Waters: the audit trail settings are fixed at project creation, and changing the system policy later only affects new projects. Create a new project with the right settings under your lab's procedure. 2
Module check
3 free questions on the parts of this module. Tap an answer, or a part of the drawing, to see if you are right and why.
Students get the full module test, with harder questions from real lab situations, and their scores saved. Students: take the module test. Not a student yet? See how to join.
Ready for the full module test? Harder questions from real lab situations, and your best score is saved. Take the module test →
Go deeper
- Settings fixed when a project is made Tablespace, options, access and Full Audit Trail Support are chosen in the New Project wizard. Check them before the first injection, not after.
- Users, privileges and shared logins Every action in the audit trail is tied to a login. That only means something if each person has their own login and only the rights their job needs.
- Backup and restore A project backup takes both the database part and the raw data, and checks the raw data files on the way. Keep it away from the PC it came from, and test a restore.
Sources
- Waters, 2017, Empower 3 Getting Started Guide (715005480). Key concepts: Project, pp. 6-7.
- Waters, 2017, Empower Software Audit Trails and Logs: a guide to the different locations of audit trails in Empower (white paper). Project and system policies, p. 2.
New modules by email
I am adding the Empower pages area by area, together with the live group Empower 3 for Beginners. Leave your email and I will send you each one when it is ready.
My HPLC newsletter too, about once a week. Unsubscribe any time. Privacy